Construction at Canary Lofts is progressing well, with the full structural frame now in place and interior spaces beginning to take shape. Steel stud walls and floor joists have been completed through the upper levels, creating clear open floor plates and strong visibility into the layout of the future suites.
On the exterior, window installation and building envelope work are advancing steadily, with sheathing, air barrier, and detailing underway across the facade. Balcony slabs are also being installed, marking another key milestone for the project.
With both structural and envelope scopes moving forward in parallel, Canary Lofts is transitioning into its next phase of construction—bringing the project closer to occupancy and adding new, safe rental housing to the Kamloops community.